TACH MEKANİK

Completed Projects

Some of the projects successfully completed by our company.

NARHOZ INSTITUTE OF ECONOMICS AND ADMINISTRATIVE SCIENCES

NARHOZ INSTITUTE OF ECONOMICS AND ADMINISTRATIVE SCIENCES

Employer: Central Bank of Turkmenistan

Main Contractor: Belda Construction Contracting and Trade Ltd. Co.

Location: Ashgabat, Turkmenistan

Project Start: September 2009

Project Completion: August 2011

Enclosed Construction Area: 126,116.05 m²

Land Area: 280,000 m²

Scope of Work

Mechanical installation works for the turnkey construction of a university with a capacity of 300 students, a residential complex consisting of 216 apartments, a secondary school with a capacity of 600 students, a kindergarten with a capacity of 160 students, 2 shopping centers, a sports complex, a dining hall and library, dormitories with a capacity of 828 students, and landscaping works.

Gökdere Children's Life Center

Gökdere Children's Life Center

Location: Gökdere, Ashgabat, Turkmenistan

Project Start: 2012

Project Completion: 2023

Within the scope of the Gökdere Children's Life Center project in Gökdere, Ashgabat, Turkmenistan, designed for 300 students, our company completed all mechanical engineering systems for various functional areas including indoor and outdoor swimming pools, dormitories, a theater hall, an administrative building, a dining hall and an amphitheater.

The installation of mechanical engineering systems and construction site works were carried out meticulously, ensuring reliable and comprehensive operation of all mechanical systems required for the project.

Scope of Work

• Indoor swimming pool
• Outdoor swimming pool
• Dormitories
• Theater hall
• Administrative building
• Dining hall
• Amphitheater
• All mechanical engineering systems